Summary
ispace-U.S. was selected as one of eight IDIQ awardees under CLPS 2, NASA's commercial lunar delivery program, which allows it to deal directly with NASA as a prime contractor. Management stressed the contrast with CLPS 1.0, where the company participated as a subcontractor. It also said it views 2029–2030, the mass-production phase, as the main window for winning orders. In 1H, losses widened at every profit level due to the impairment booked in 1Q. However, full-year guidance was maintained, with revenue and subsidy recognition concentrated in 2H. M3 has completed its PDR following the engine change. Key items to monitor are the fix for altitude recognition and the timing of subsidy receipts.
Key Points
- Management Strategy and Market View
- Management frames CLPS 2 (10 years, USD 10B contract ceiling) as a demand signal that NASA will keep buying finished services as a customer
- CLPS 1.0 selected more than ten companies based largely on paper reviews. By contrast, management sees CLPS 2 as a selective program focused on proven landing capability
- Only one company has landed successfully on the Moon so far. NASA therefore aims to foster multiple providers and drive prices down, and management sees the relationship among the eight awardees as both competitive and cooperative
- Cislunar security is now one of two core themes alongside lunar infrastructure. The company plans to actively pitch the SSA capabilities of its M2.5 satellites to the US Space Force
- Current Business Progress and Drivers
- In 1Q, the company booked an impairment of approx. JPY 3.7B in COGS related to lander model consolidation and the engine change. This was the main driver of the wider 1H loss
- 2Q standalone operating loss narrowed to JPY -2,456M from JPY -6,397M in 1Q
- From M3 onward, the business enters its commercialization phase. As a result, the Japanese entity's main expense category is shifting from R&D to COGS, and development-related expenses fell 25.1% YoY
- 1H payload revenue was weak. Following the MAGPIE contract signed in September, revenue and subsidy recognition are set to accelerate in 2H as M4 development progresses
- Key Strategic Initiatives and Changes
- ispace-U.S. was selected from approx. 15 candidates. Having moved from a Draper subcontractor under CLPS 1.0 to a prime contractor, it can now bid directly for individual task orders and capture the full revenue from each mission
- The engine co-developed with a US partner failed to meet required performance by the deadline, prompting a change of supplier. PDR was completed after roughly six months of verification
- The company signed MOUs for ongoing supply of Nammo main engines and Ariane assist thrusters. Management openly acknowledged that M2's altitude sensor lacked sufficient flight heritage
- A new memorandum of understanding was signed with KDDI. The partners will explore an end-to-end network that combines the Luna Connect service with ground stations and lunar surface mobile communications
Outlook
- Full-year guidance (revenue JPY 3,300M; project revenue JPY 9,000M) was maintained. By our estimate, approx. 80% of the full-year net loss forecast was already booked in 1H, and guidance assumes lump-sum subsidy recognition in 4Q
- Management expects CLPS 2 orders to center on Phase 2, after the 2027–2028 missions already awarded under CLPS 1.0. It views the 2029–2030 mass-production phase as the largest commercial opportunity
- Launch schedule: M3 in 2028, M4 and M5 in 2029. Lander mass production is intended to scale the business and improve profitability
- Under M2.5, the company plans to deploy the Alpine relay communications satellite on an Argo Space transfer vehicle as early as 2027. It aims to deploy at least five satellites by 2030
- The company was selected for JAXA's conceptual design of a lunar solar power tower. JAXA is targeting launch as early as FY2030
- The CEO described the CLPS 2 selection as a starting point rather than the finish line. He pledged to pursue sustained, large-scale order wins and a return to profitability
Positive Factors
- CLPS 2 envisages an estimated 70+ landings across only eight awardees. This implies more than eight opportunities per company (company estimate), up from approx. 1.3 under CLPS 1.0
- Secured backlog totals approx. JPY 54.4B. Of this, approx. JPY 50.7B is not yet recognized and is expected to be booked over the next five years. Pipeline (potential demand) stands at approx. JPY 85.7B
- The company has invested more than USD 200M cumulatively in the US and runs lander development through operations from its Denver base. Management said the depth of its dialogue with NASA is markedly different from before
- In the US, CLPS and a lunar base enjoy bipartisan support. The Space Force is also promoting use of commercial technology for surveillance, communications, and navigation in the cislunar domain
- Japan is revising its Basic Plan on Space Policy, and ESA will discuss concrete measures at its ministerial meeting in December. The company is pitching CLPS-style demand creation to both ESA and the Japanese government
Concerns
- Subsidy receipts depend on when development milestones are achieved. The company itself flagged the risk that 2H receipts could vary or slip into the next fiscal year. SBIR receipts for M3 are expected to increase in 2H of this fiscal year
- Equity ratio stands at 13.9% (per the earnings release). Negative free cash flow widened in 1H, and the company acknowledges the need to strengthen its financial position
- IDIQ selection does not guarantee individual task orders. The company competes with seven others, including SpaceX and Blue Origin, and NASA's plans and payload size mix could change
- Altitude recognition remains unproven among lunar landing technologies. A switch to flight-proven components has been decided, but additional verification testing is still under consideration
- M3 launch was originally agreed with the SBIR secretariat for within 2027, but is now expected within 2028. This remains in the coordination stage pending METI approval
- FX swings cause significant earnings volatility, with a 2Q standalone FX loss of JPY -1,205M
Performance Highlights
1H revenue fell sharply, as the prior year's revenue from M2 and the former M5 did not recur. Net loss widened to JPY -10,451M, mainly due to the 1Q impairment. Progress against full-year guidance was 18.6% for project revenue and 17.2% for revenue, with both weighted toward 2H. In September, the company borrowed JPY 3B from Shizuoka Bank on an unsecured, unguaranteed basis with bullet repayment in three years. Even so, cash and deposits fell JPY 7.1B from the prior fiscal year-end.
Segment Performance
| Segment | Revenue | YoY | Operating Income | YoY |
|---|---|---|---|---|
| Company-Wide (Consolidated) | JPY 569M | -74.1% | JPY -8,853M | ― |
- Project Revenue (company estimate adding approx. JPY 1.1B in subsidies received to revenue): JPY 1,675M (project revenue per the earnings release is JPY 569M; subsidy income is recognized at fiscal year-end)
- Cash and Deposits: JPY 22,585M (-23.9% vs. prior fiscal year-end)
- Net Assets: JPY 5,731M (-62.2% vs. prior fiscal year-end)
- Interest-Bearing Debt: JPY 30,888M (+4.9% vs. prior fiscal year-end)
- Advances Received + Contract Liabilities: JPY 2,259M (+199.6% vs. prior fiscal year-end)
- Free Cash Flow: JPY -8,518M (prior-year period: JPY -7,473M)
- Total Shareholders: 136,233 (up approx. 20,000 vs. end-March)
Q&A List
- Q
CLPS 2 is the major topic of these results. Starting with the basics, what is CLPS, and what is NASA trying to achieve with it?
AWinning CLPS 2 has really energized the company. CLPS stands for Commercial Lunar Payload Services, essentially a lunar delivery service. Under the program, NASA regularly buys lunar delivery services from providers capable of reaching the Moon. When NASA or a space agency provides funding, people tend to picture subsidy-style grants for technology development. That exists too, but NASA believes grants alone will not accelerate progress. NASA has declared that it will buy services from the private sector as a customer. It is sending a demand signal that it will keep buying finished services, even if they carry some risk. CLPS 2 is exactly that, clearly presenting the private sector with very large future purchasing demand of USD 10B over ten years. In effect, NASA is saying: we will be your customer, so build the vehicles that can get there. Ultimately, the technology does not matter. If you deliver to point A on the Moon, NASA pays a set service fee. It is a truly groundbreaking program.
- Q
CLPS 2 is the second iteration. How does it differ from the first CLPS?
AThe first CLPS, now called 1.0 since CLPS 2 has arrived, was a package of up to USD 4.2B to be used over ten years. It actually started at a much smaller amount and was only recently increased. Beyond the amount, the number of participating companies also differs. Under 1.0, nobody had landed yet and no landing-capable vehicles had been developed. Selection was therefore based almost entirely on paperwork, and NASA picked everyone who looked capable on paper, since it could not tell who would succeed. That is why more than ten companies were included. With CLPS 2, companies with genuine capability, including us, have emerged. Our understanding is that NASA focused this time on companies it judged capable of reliably landing on the Moon, and so narrowed the field to eight. Some 1.0 participants were hard to assess, which may have made evaluation difficult for NASA. This time NASA has chosen companies that can land, so we expect it to place orders with them steadily. It does feel highly selective. Some companies we expected to make it were actually cut, which tells us NASA was very selective. USD 10B is roughly JPY 1.6T. The previous USD 4.2B was impressive, but this is a very bold figure and the demand signal feels genuinely strong. It is a critical factor as we advance our business.
- Q
Is a program that buys services from the private sector unusual? Are similar initiatives underway outside the US, or is NASA unique?
AThe US is clearly ahead. NASA built this framework and is stimulating demand. A space agency is a formal government body. If it simply told the private sector to start lunar delivery services, there would not be enough private customers. So NASA acts as the customer for a certain period, which is very much to its credit. It is leading the world in rolling out these delivery programs. We would like to see the same in other major markets such as Japan and Europe. In Europe, ispace EUROPE has continuously pitched this to ESA. In Japan, our understanding is that CEO Hakamada and others have asked Japanese government officials to consider it.
- Q
Shareholders' biggest concern is whether the company can actually win orders. Some view CLPS 1.0 as not having delivered sufficient results. What is different for ispace, inc. this time?
AFirst, the way we participate differs greatly between CLPS 1.0 and CLPS 2. Under 1.0, we were not selected as a prime contractor. Longtime supporters may recall that we participated as a subcontractor under US companies such as Draper. As a result, we could not directly control proposals, costs, or program management, and worked in collaboration with the prime contractors. Under CLPS 2, our US subsidiary ispace-U.S. has been selected as a prime contractor able to contract directly with NASA, so there is no intermediary. We can offer our own services and promote ourselves directly. NASA essentially evaluates the prime contractor. No matter how much we promoted ourselves as a sub, NASA had to look at the prime's capabilities and track record. Now we will be evaluated directly. Frankly, we are the ones with the track record, so it will be properly recognized and we can pitch ourselves more easily. We expect that to significantly raise our probability of winning. The second point, as mentioned, is the smaller number of companies. NASA needs to carry out 60 or 70 lunar landings going forward, so it will keep placing orders with companies it believes can deliver. In that sense too, we see a reasonably high probability of orders. The first CLPS started around 2018, and we have been working on it for about eight years. There have been various changes, including model changes. One thing is clear, however: the depth of communication between our US entity and NASA is at a completely different level from before. We now understand NASA's thinking much better, and the strengths of our ULTRA lander are being fully conveyed. That relationship is steadily taking shape, and the environment is entirely different from the past. Getting selected for CLPS 2, in other words getting into the arena, is critical. From here, multiple companies will be selected in turn, so we have high expectations and are genuinely excited.
- Q
Eight companies worldwide were selected for CLPS 2. Does ispace, inc. need to beat these eight to win orders, or is that not the right way to think about it?
AThere will be competition. Of the eight, though not necessarily all will bid, companies will submit proposals and be selected. Importantly, NASA wants this competition. From NASA's perspective, it is important that multiple private companies emerge. We believe it will give each of the eight broadly equal opportunities and hopes they all mature. We do need to win competitions, but growing together is also a very important concept. Put bluntly, only one company has landed properly so far, even from NASA's standpoint. NASA cannot bet everything on that one company or those close to it, so it wants more options. From our view, it is still in the stage of testing various providers. As a customer, NASA benefits if prices fall, so having multiple providers is preferable.
- Q
Space and security discussions tend to focus on Earth-orbiting satellites. Is the Moon relevant too?
AIn the broad sense of security, the Moon has become an important element of US–China competition. The next consideration is traffic. As lunar infrastructure is built and deliveries increase, various spacecraft will start traveling between the Earth and the Moon. Some may turn back midway, and such objects could pose a threat in the future, even unintentionally. Detecting them and protecting critical infrastructure in LEO and GEO is becoming very important. Awareness of this has risen sharply. In the space situational awareness (SSA, SDA) community, the idea has emerged that resilience of GEO assets and infrastructure can be strengthened through cislunar systems further out. Understanding of the importance of lunar-side systems is growing and is now discussed publicly. The US Space Force and others are likely considering actual implementation. Recent news suggests the era of study is over and the era of implementation has begun. We are hearing this often from the US, and it seems to have increased sharply since the start of 2026. Picture the Earth, satellites around it, and the cislunar space extending toward the Moon. Until now, attention was limited to the area around Earth. Now the lunar side needs attention too. Satellite startups have often been associated with security and defense, while ispace, inc. was thought to have no such angle, but this simply took time. Security first covered Earth-orbiting satellites, gaining momentum over the past three years or so, mainly in the US. It is now expanding toward the Moon. This area currently has no visibility at all, so calls for proper satellite monitoring are increasing rapidly. Cislunar security is one of our two key recent themes alongside the lunar surface. Lunar landing and infrastructure on one side, and cislunar security via M2.5 satellites and Luna Connect on the other, are very hot areas right now.
- Q
In the context of lunar orbit satellites, the results presentation mentioned a partnership with KDDI. What does it involve?
AWe announced a memorandum of understanding with KDDI. Satellites are an important piece, and this is about building an actual communications network. We announced Luna Connect and plan to operate communications satellites around the Moon. Satellites alone, however, cannot establish communications. Equipment on the transmitting and receiving ends is also needed, such as parabolic antennas at ground stations on Earth and mobile stations on the lunar surface. We want to build end-to-end services covering all of this, and will discuss future business collaboration with KDDI toward that goal. Having one of Japan's leading telecom companies involved is highly significant. KDDI operates smartphone services, of course, but as many know, it also offers satellite-based Starlink services and is well advanced in space communications. It is also investing heavily in lunar surface mobile communications, leveraging the Space Strategy Fund and other programs. ispace, inc. is still a small company, so providing Luna Connect alone would be very difficult. We need large partners. This new agreement with KDDI is an update, but its content has become more substantive and deeper as we build Luna Connect with support from many partners. It is very exciting, and the seeds we have planted are progressing step by step. Our relationship with KDDI goes back to HAKUTO, starting with a sponsorship that placed its logo on the side of our rover, and we are grateful for this long partnership. We are delighted that we can now work together on a truly commercial basis.
- Q
ispace, inc.'s opportunity in CLPS 2 appears to lie in small landers. NASA's chart suggests 2027, when eight small lander orders are planned, is the key year. That seems to come before M3 and M4. How should we assess the likelihood of winning orders?
AIndividual CLPS 2 orders, called task orders, will be issued going forward, so some things remain unclear until we see them. Our understanding, however, is that the 2027 and 2028 missions you mention are already covered by task orders NASA issued under CLPS 1.0. Realistically, new orders are unlikely on such a short timeline. We expect orders to come mainly from Phase 2 onward. In our milestones, M3 in 2028 and M4 in 2029 are Japan-originated missions supported by subsidies from the Japanese government and METI. The period after that, around 2029–2030 covering M5, M6, and M7, is the hottest timing being discussed worldwide, including Japan, Europe, and the US. 2029 comes up as a keyword with every customer we speak to. We sense the next CLPS 2 orders will cover 2029–2030, when mass production ramps up sharply.
- Q
The CLPS 2 budget is large, but the opportunity accessible to ispace, inc. seems limited. What share does the small lander segment represent, and do you plan to expand beyond small landers?
AThe chart gives some figures on small landers versus mid-size landers at the multi-ton level. Whether NASA executes exactly as shown is NASA's decision. As NASA often says, flexibility is needed, so some plans may change from the original. Early on, we expect many small payloads, so demand for small landers should be relatively high. Delivery volumes may grow in the future, but we believe the small lander segment will continue. How far we scale up will be considered going forward. As a CLPS 2 prime contractor, however, we can now discuss NASA's future direction with it directly, and we will shape our strategy accordingly.
- Q
Based on that explanation, is it correct to understand that Phase 1 is largely covered by CLPS 1.0, and that CLPS 2 will mainly address Phase 2 onward?
AThat understanding is fine. On timing, NASA would of course prefer to move faster if possible. Realistically, though, 2027 is about to begin, and building a new lander from scratch takes at least about two years, which points to around 2029. NASA naturally recognizes that faster is not always better. Rushing could produce inadequate hardware or ultimately cause delays. Our impression is that NASA is balancing its ambitions with realistic expectations. This is not resignation to inevitable delays, but a firm grasp of what is realistic. Also, not all of the white boxes in the chart are filled by CLPS 1.0 yet. Our understanding is that some have been only about half ordered under CLPS 1.0.
- Q
Lander sizes appear to shift toward larger vehicles in Phase 2. Is it correct that you are assuming reality may not unfold that neatly?
ANASA has published this chart, but it is still considering which payloads to deliver, and things will likely change along the way. Large landers are not impossible, but various small lander needs may still emerge. In that sense, our understanding is that NASA has not yet firmly concluded that specific masses must fly at specific times. We will make our own judgments as discussions progress. This Ignition chart shows how NASA wants to proceed, but it contains many variables. Our US entity is in continuous dialogue with NASA about what it wants to do and when. We therefore believe there is still ample room for our ULTRA lander to contribute. Frankly, we do not think it is necessary to be overly bound by this chart.
- Q
Regarding the upcoming M3, how does the engine announcement contribute to M3's success? Are there any implications for M4 and later missions?
AAs announced around March, we had been developing a new engine with a US partner. It was not a complete failure, but it could not deliver our required performance by the deadline. We therefore changed our plan and switched engine suppliers. This time we announced MOUs with two companies, Nammo and Ariane. Internal joint studies had been underway for a long time, and they have now culminated in PDR completion. Our engineering team spent about six months verifying that the new ULTRA lander integrates well with these engines. The first key point is relief: the engines are in place, and we finally have confirmation that quality can be maintained. The second point, which is very important, is that both Nammo and Ariane engines have spaceflight heritage, including use on lunar missions. A first-time engine raises concerns about whether problems will arise. In hindsight, the altitude recognition sensor behind M2's failure lacked sufficient flight heritage, and we have taken that lesson to heart. This time the issue is the engine rather than altitude recognition. Still, we have used Ariane on the RESILIENCE lander since M1, and adopting highly reliable components for our own lander is the most important point.
ENVALITH, INC. ("ENVALITH") provides exclusive research coverage services to domestic and international institutional investors, as well as domestic individual investors, with the objective of contributing to the development of global and Japanese capital markets by providing information necessary for considering investments in Japanese listed companies.
- Purpose and Disclaimer Regarding Investment Decisions
This report has been prepared solely for informational purposes and does not constitute a solicitation to acquire, sell, or hold securities or any other financial products. Furthermore, this report does not constitute specific investment, financial, or tax advice. Any opinions, judgments, or recommendations contained herein are not intended to induce investment activities. Please be advised that all investment decisions must be made based on the investor's own responsibility and judgment, and ENVALITH and subject company shall not be involved in any such investment decisions.
- Information Sources, Accuracy, and Disclaimer of Warranty
This report has been prepared based on a formal request from the subject company, utilizing information provided by and interviews conducted with said company. By using this report, you are deemed to have agreed to the following: 1. Information Sources: This report is prepared on the assumption that the publicly available information and information disclosed by the subject company and provided during interviews is true and reliable. ENVALITH has not independently verified or validated the veracity of such information. 2. Accuracy: The interpretations, analyses, and hypotheses or conclusions based thereon contained in this report are independently derived by ENVALITH using its own perspectives and analytical methods based on the information mentioned in the preceding paragraph. 3. Disclaimer of Warranty: In the event that there are errors or omissions in the information disclosed by the subject company, ENVALITH and subject company shall not be held liable for any inaccuracies in this report resulting therefrom. ENVALITH and subject company make no warranties, whether express or implied, regarding the accuracy, safety, validity, completeness, or any other aspect of this report, nor regarding the past or future performance of the subject company.
- Limitation of Liability
ENVALITH and subject company shall not be liable for any costs, damages, or losses (including direct, indirect, incidental, consequential, or punitive damages) arising from the use of this report or the information obtained therefrom. Users of this report acknowledge and agree that such use is at their own risk.
- Potential Conflicts of Interest
ENVALITH may have, or may have in the future, business relationships with the subject company. Accordingly, investors should be aware that conflicts of interest may exist that could affect the objectivity of this report.
- No Obligation to Change or Update Content
The contents and opinions in this report, as well as the information upon which it is based, are current as of the date of preparation and are subject to change without notice. Please be advised that ENVALITH is under no obligation to update the contents of this report, and investors must verify the timeliness of the information on their own.
- Governing Language
This report is prepared in Japanese, English, and Chinese. In the event of any discrepancy or difference in interpretation between the language versions, the Japanese version shall be treated as the original and shall prevail.
- Copyright
All rights (including copyrights) relating to this report belong to ENVALITH. Any reproduction, redistribution, or other use of all or part of this report without the prior written permission of ENVALITH is strictly prohibited.
- Use for Other Investment Products
Except where ENVALITH has provided prior written approval, the use of this report and the trademarks or trade names of ENVALITH or the subject company in connection with the information distribution, transaction, sales promotion, or advertising of any investment products (including derivatives, structured products, investment trusts, or investment assets whose price, return, or performance is based on or linked to this report) is strictly prohibited.